Throughout the past forty years, change has been constant. Rayburn has worked with its Members to reach a solution that ultimately maximizes the value and quality of life of the families located along those power lines.
–David A. Naylor
1979

Rayburn is formed
1986

First Rayburn staff added
1989

Rayburn moves partial ERCOT load to Southwest Power Pool (SPP)
1994

Rayburn’s first transmission line becomes energized
2010

Rayburn acquires partial ownership in Freestone Energy Center
2013

Joined ACES
2020

All of Rayburn load moved to ERCOT
2020

Rayburn certified as a Transmission Operator by NERC
2022

Became 1st Coop in the nation to issue Securitization Bonds
2023

Rayburn Energy Station Acquisition